Mainland Britain's first grid connected wind turbine at a school,Cassop Primary School, Cassop,Co. Durham UK
Turnkey Contractor - Inherent Energy Ltd for Durham County Council
3-phase 415volt supply to School
An AOC 15/50 wind turbine (rated at 50kW) was chosen by Durham County Council for installation at this site. WINSUND were successful with their Tender to supply,install & commission the wind turbine - including grid connection to Northern Electric's distribution network and G59 compliance.
AOC 15/50 wind turbine generator rated at 50kW
- 18.8m (60ft) lattice tower
-Wind Turbine Controller with PLC,Soft Start & Grid Monitor Relay
-Civil Works & Cable Laying of main power & control cables (120m)
-Grid Connection and G59 testing & compliance with export/import metering
-“Live Time” Interactive Display in the School
Now in it's third year of operation at the School the wind turbine has been a great succes. It is anticipated that it will generate around 100,000kWh per annum at the site. It has become a focus for the children and staff at the School. They have won the coveted Kuoni Award for their environmental teaching & awareness.
The wind turbine was officially opened by British Prime Minister - Tony Blair - whose parliamentary constituency is next door to Cassop.
Phase 1: the civil works and cable laying across the playground were completed during the October School half-term to minimise disruption.
Phase 2: The turbine was shipped from the USA and installed during the School February half term. The project was completed ON TIME & ON BUDGET. Mike Seeley from Inherent Energy became known to the pupils at Cassop as “the wind man” & we made a donation to set up the School web site www.cassopschool.org.uk
Challenge
Existing
Solution
Tech Spec
Result
Specials
You are viewing the text version of this site.
To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.
Need help? check the requirements page.